Check and audit
Start here. Verno reads, changes nothing.
List reconciliation
Audit the valve list against the P&IDs. Show me every row that does not match.
Cross-document consistency
Check the tie-in schedule and the electrical and I&C drawings against the P&IDs.
Tag traceability
Find every drawing and document where this tag appears.
Issue readiness
Every drawing in this package: right revision, right date, right stamp. Before I issue.
Backed by Y Combinator